Pole Line Construction 

A utility worker in a raised bucket truck repairs power lines on a wooden pole in a rural field under a clear blue sky. The vehicle’s stabilizing legs are extended for support on the grass.
Industrial / Power Distribution - Lawerence County, PA

Our team successfully completed a high-voltage distribution installation to provide electrical service to a customer’s natural gas metering pad in Lawrence County, Pennsylvania. This project was classified as a utility installation and required full overhead pole line construction to extend medium-voltage service to a remote metering site. The scope included setting new utility poles, installing crossarms and insulators, stringing and sagging primary conductors, and installing a primary metering system in accordance with First Energy-Penn Power specifications and industry standards.

Given the rural location and utility-grade requirements, the project demanded careful planning, coordination, and specialized off-road equipment. Our crews managed material logistics, equipment access, and construction sequencing to maintain efficiency while meeting all inspection and compliance standards. The completed installation provides dependable, long-term electrical infrastructure to support critical natural gas operations, demonstrating our capability to deliver high-voltage distribution projects safely, efficiently, and to utility provider standards.